Sales manager

Ms.Sara

Rapid River (Double Loop)

Product Description

The “Double Loop” Rapid River is a premier water attraction designed to maximize thrill and operational efficiency. Distinguished by its extensive 280-meter water channel and unique double-loop layout, this ride offers an extended journey through scenic landscapes before culminating in two dramatic drops.
Equipped with a high-capacity electric roller transmission system, the ride ensures precise speed control and smooth operation. With a passenger capacity of 20 per cycle and robust safety interlocks—including lift-station braking synchronization—it delivers a secure yet adrenaline-pumping experience for guests of all ages.
  • Extended Track Layout: A massive 280m water channel provides a longer, more immersive漂流experience compared to standard models.
  • Dual Thrill Peaks: Features two separate lift hills (6.5m and 9.5m), creating varied pacing and multiple splashdown moments.
  • Advanced Safety Systems: Integrated interlocks between the secondary slide and station brakes prevent collisions, while lift-station synchronization ensures safe loading and unloading.
  • High Efficiency: Powered by a 71kW total system load, utilizing a reliable electric roller/conveyor belt drive for consistent performance.

Parameter

Parameter Specification
Product Name Rapid River (Double Loop)
Equipment Class Class B
Passenger Capacity 20 Persons (4 persons/boat)
Boat Configuration 8 Boats (5 Operating, 3 Standby)
Track Length 280 Meters
First Lift Height 6.5 Meters
Second Lift Height 9.5 Meters
Operating Speed 11.9 m/s
Lift Speed 1.0 m/s
Total Power 71 kW
Drive Power 13 kW
Drive Type Electric Roller / Conveyor Belt
Main Pump Power 55 kW
Splash Pump Power 2.2 kW
Air Compressor Power 3.0 kW
Footprint (L×W) 27m × 60m
Power Supply Three-phase Five-wire System
Design Life 8 Years
Compliance Standards GB8408-2018, GB/T18159-2008

Installation & Site Requirements

  • Standard Terrain: For installations in standard parks with stable soil, general site preparation is sufficient without extensive geological surveying.
  • Complex Terrain: For sites located in scenic mountain areas or coastal zones with complex geological or meteorological conditions, a third-party professional survey is required. Secondary foundation design must be conducted based on these survey results to ensure structural integrity.
rave duck ip theme

Customize Your Park Solutions